Flooring Installation Timeline: What to Expect from Start to Finish

DIY_Glue_Down_Flooring_Installation_Guide-1

Help homeowners plan their projects by detailing realistic timelines and process steps. Pre-installation phase (1-2 weeks): selecting materials, ordering supplies (popular items may have 2-4 week lead times), scheduling installation, preparing the space (removing furniture, existing flooring if needed). Day before installation: clear the room completely, remove baseboards if keeping them, ensure pets/children arrangements. Installation day breakdown by flooring type: Hardwood (3-5 days for 1,000 sqft – includes installation, sanding, staining, multiple finish coats with drying time), Laminate/LVP (1-2 days for same space – faster installation, immediate use after 24 hours), Tile (4-7 days – includes setting, grouting, sealing; can’t walk on for 24-72 hours), Carpet (1-2 days – quickest installation, can use immediately). Post-installation (1-7 days): curing time, reinstalling baseboards/trim, moving furniture back (use felt pads), initial cleaning. Address common concerns: living arrangements during installation, dust and noise levels, odor from adhesives/finishes, protecting new floors during final touches. Include tips for preparation like packing up rooms, creating workspace access, confirming measurements before ordering. Add a printable checklist. Explain how your company provides detailed project schedules, communicates daily progress, and respects homeowners’ time with efficient, professional crews. This transparency builds trust and sets proper expectations.

 

Share the Post:

Related Posts

hero form